CASE STUDIES

CS_NYU_THUMB

NYU LANGONE HEALTH

"On top of the interesting composition of the project, the structure of it was quite complex, bending in two directions as it lined the pavilion."
READ MORE
CS_ROCKEFELLER_THUMB

ROCKEFELLER UNIVERSITY

"The new design saved the client about one million dollars and weeks of installation time."
READ MORE
CS_5CRESCENT_THUMB

5 CRESCENT DRIVE

"These methods allow complex geometries to be simulated and fabricated off-site with an extremely high level of precision, speed and safety."
READ MORE
CS_IDS_THUMB

IRENE DIAMOND STAGE

"This design significantly decreased the installation time because the cleats enabled a self-correcting logic so the panels could not be installed incorrectly, they simple had to be hung in the correct location."
READ MORE
CS_AGJBT_THUMB

ALICE GRIFFIN JEWEL BOX THEATRE

"EMI’s BIM model was used to coordinate all other trades that were installed behind our custom panels."
READ MORE
CS_LG_THUMB

LG HEADQUARTERS

"Eastern Millwork was able to maintain the clients aesthetic intentions while shifting the fabrication and installation details into buildable components."
READ MORE
CS_375HUDSON_THUMB

375 HUDSON STREET

"The Turner Conference Table is a prime example of the level of customization possible at Eastern Millwork."
READ MORE